WITHINGS WBS13W Body Smart Scale - White

£89.00
  • Home delivery from 9 November **

  • 2 years warranty
view basket

Buying 3 or more items? Use our Multibuy Function.

WITHINGS WBS13W Body Smart Scale – White

The WITHINGS WBS13W is a smart scale designed to provide a comprehensive assessment of your body, helping you monitor your daily health with precision. Track your weight with an accuracy of within 50g and achieve your fitness goals faster with detailed body composition analysis, including muscle mass and fat percentage tracking.

Beyond weight, this smart scale offers a complete picture of your well-being. Monitor your heart rate at each weigh-in, track hydration levels, check your basal metabolic rate and age, and view your BMI for a deeper understanding of your health.

Featuring a high-resolution colour screen and an easy installation process, the Body Smart scale is designed for convenience. It can recognise up to eight users, making it an ideal choice for families.

Key Features:

  • Precise weight measurements: Accuracy within 50g
  • Comprehensive body analysis: Track fat percentage, muscle mass, and hydration
  • Visceral fat index: Gain deeper insights into your health
  • Heart rate tracking: Monitor your cardiovascular health at every weigh-in
  • Multi-user support: Recognises up to eight different users

Product Dimensions (H x W x D): 2.5cm x 32cm x 32.5cm

General

  • Additional Information:

    • Precise weight measurements
    • Advanced body composition
    • Health insights
    • Cardiovascular insights
    • Nutrition tracking
    • Daily weather forecast
    • Monitors standing heart rate
  • Features:

    • Consistent and precise weight measurements
    • Comprehensive view of your body
    • Visceral fat index
  • Product Type: Smart Scale

Technical Details

  • Display Details: Colour
  • Smart App Control: Withings App

Design Elements

  • Colour: White
  • Colour Group: White

Scales & Monitors

  • Muscle/Fat Percentage Tracking: Yes
  • Athlete Mode: Yes
  • Baby Mode: Yes
  • Number of Users: 8
  • Pregnancy Mode: Yes
  • Tracks Metabolic Parameters: Yes

Usage & Features

  • Application/Usage: Perform a powerful body check-up

Connectivity

  • Bluetooth: Yes
  • Wi-Fi: Yes
  • Smart App Control: Withings App

Dimensions & Weight

  • Depth: 32.5 cm
  • Height: 2.5 cm
  • Width: 3.2 cm
  • Weight: 2.5 kg
  • Shipping Depth: 21 cm
  • Shipping Height: 38.8 cm
  • Shipping Width: 38 cm
  • Shipping Weight: 12.08 kg

Height - 025 mm

Width - 320 mm

Depth - 325 mm

Write your own review
  • Only registered users can write reviews
*
*
Bad
Excellent

General

  • Additional Information:

    • Precise weight measurements
    • Advanced body composition
    • Health insights
    • Cardiovascular insights
    • Nutrition tracking
    • Daily weather forecast
    • Monitors standing heart rate
  • Features:

    • Consistent and precise weight measurements
    • Comprehensive view of your body
    • Visceral fat index
  • Product Type: Smart Scale

Technical Details

  • Display Details: Colour
  • Smart App Control: Withings App

Design Elements

  • Colour: White
  • Colour Group: White

Scales & Monitors

  • Muscle/Fat Percentage Tracking: Yes
  • Athlete Mode: Yes
  • Baby Mode: Yes
  • Number of Users: 8
  • Pregnancy Mode: Yes
  • Tracks Metabolic Parameters: Yes

Usage & Features

  • Application/Usage: Perform a powerful body check-up

Connectivity

  • Bluetooth: Yes
  • Wi-Fi: Yes
  • Smart App Control: Withings App

Dimensions & Weight

  • Depth: 32.5 cm
  • Height: 2.5 cm
  • Width: 3.2 cm
  • Weight: 2.5 kg
  • Shipping Depth: 21 cm
  • Shipping Height: 38.8 cm
  • Shipping Width: 38 cm
  • Shipping Weight: 12.08 kg